|
Garner Office Progress 11-24-2006
Dave Arndt, Jerry Nedved, and Kenny Engstler did a walk through on the progress of the new Garner office building located at 135 Cottonwood Drive. At the beginning of the week, the frame work was completed and Kenny, and his men, began insulating and sheetrocking. Below are pictures taken of the office during the walk through.

Picture of Jerry Nedved's office and the window connecting his office to the front lobby.

From front lobby window facing to the back door.
You can see the hallway taking shape here now.

Inside of Jerry Nedved's office.

Inside of Ray Waddingham's office.

Picture of extra office's wall that adjoins to the front lobby.

(From Left) Kenny Engstler discusses renovation progress with
Jerry Nedved and Dave Arndt.
|